Having spent the bulk of the year building out the Sungas Services scene, it’s now complete. On my laundry list for the second half of the year is going back and photographing or re-photographing some of the other scenes on the layout.
Author: Lmind1
Controlling Lines of Sight
Controlling what portions of a layout a visitor sees at any given time, and from any given location, enhances the viewing experience. I can’t think of any layout I’ve been to where this is even an issue….except mine. In most cases the shape of the layout, walls, backdrop locations, or geography frame the layout in […]
Removing Layout Design Blinders
Having reached the siding at the end of the branch on The Downtown Spur, the local has just performed a runaround move to prepare for the return trip in this June 2008 photo. This move is still required today to work the line. When it comes to layout design it’s so easy, as much as […]
June in Miami
I was able to finish the bulk of the Sungas Services scene this month. All that remains are the crossing flashers and it’ll be done. This was the last of the remaining industries on the layout to be built out. There are still a lot of non-rail structures to be built though. With the industry […]
Sungas Ops. Trial Run
Having made the trip down to the run around to get on the correct side of the train, the local has pulled the empties and is getting ready to cut off the loads and spot them. The two loaded cars are by the locomotive. Since I hadn’t built out the structures for Sungas until recently, […]