Author: Lmind1

Weeks Gas – East Rail 2

The latest project on East Rail 2 is Weeks Gas. Although it won’t ever be confused for an architectural masterpiece, it is iconic in the area by virtue of its front and center location at the entrance to the industrial park. Building flats are typically visually jarring and generally don’t work. You can get away […]

The Photo Shoot

I’ve gotten a number of questions as to how the photo shoot in my last post was handled, specifically the lighting. Since the tripods were still in place, it’s easy enough to show. I used only ONE photo flood and turned all of the room lights OFF before taking the shot. Note the light position […]

The “East Rail” Name

It’s February 15, 2006 at the “East Rail” industrial park (looking southward). Looking at the tracks to the right we have (back to front): No. 1 Main (back), No. 2 Main(middle), and the “East Rail” siding (foreground) . East Rail got its name by virtue of being “East” of the double track main. At the […]

East Rail 2 Update

Before and after views of the East Rail 2 layout room The bulk of my time since the last update has been spent on cleaning and renovating the East Rail 2 layout room. Photos of me elbow deep with a scrub brush removing asphalt tile adhesive doesn’t make for the most captivating blog posts hence […]