Wrapped up my CF-7 project…..finally!
CF-7 Finished!
- Post author By Lmind1
- Post date
- Categories In Construction, Los Angeles Junction Railway
Wrapped up my CF-7 project…..finally!
At the corner of Corona Avenue, I had roughly a six-inch gap to fill between the street and the primary industry on that block. I didn’t want anything too over the top and something that blended into the neighboring structure. For the side with the tagging on it, I used an image from my trip to […]
Chipping away at the details on LAJ CF-7 #2619….. Cut levers from an Athearn Genesis F unit, air hose, and MU stand. The prototype only had two stacks so I shaved two of the four stacks off.
Since the last post, I’ve simply spent some time running and breaking in the re-powered CF-7 on my Downtown Spur layout. I don’t know how long the donor Kato mechanism was sitting in the box (over a decade maybe?), but it has really smoothed out to be a silky smooth runner after logging some run […]
Adding A Kato Drive Train and Wow Decoder to an Athearn CF-7 Well, that was a process (or, in terms my less refined readers can understand…a major pain in the ass) but in the end entirely worth it. The CF-7 now houses an upgraded Kato drive and TCS Wow decoder. I’m happy. Essentially the […]