Brooklyn Terminal Feb. 8


With the turnout rail pieces fashioned, the next step is to prepare the PC ties (they’re used to hold the rail in position). In all other locations traditional wood ties will be used. Printed circuit board is much thinner than flex track or wood ties and the height differential is a bit of a pain […]

Brooklyn Terminal February 2/2/20


After a holiday break it’s back to work on the Brooklyn Terminal. Currently on the docket is fabricating three of the remaining six code 40 turnouts. The first step is cutting and filing the individual rail pieces. I do this by lightly clamping them in a small hobby vise. There isn’t much material with code […]

Detailing the Shoreline


This week I detailed the shoreline. First up was adding the high tide “stain” which was done by carefully masking things off with damp paper towels and lightly airbrushing on Model Master “sand”. Next up I used the same dampened paper towel technique to add static grass at the top of the embankment and between […]