Brooklyn Terminal April 25


Since the BT is a small terminal line with appropriately small steam power, I didn’t want the service facilities to be overwhelmingly large. Most commercially available water towers were simply too big so I kitbashed a Walthers rooftop water tank with some Tichy parts spliced on. The coal conveyor is from ModelTech Studios. The yard […]

Brooklyn Terminal April 12


Referring to my lack of recent blog postings, a few readers have wondered if I’m floating face down in the Calumet River, the victim of a long overdue mob hit. Rest assured progress continues. As I mentioned, postings about the latest few inches of progress land laying code 40 turnouts doesn’t make for the most […]

Brooklyn Terminal March 7


Weekly updates on my hand laid code 40 turnouts are probably as compelling as that of a farmer’s update on the growth of his corn field! The three turnouts I was working on off layout were finished and placed on the layout replacing the temporary Peco track that was serving as a placeholder. Now that […]

Brooklyn Terminal February 23


One of the signature structures on my old Monon layout was Bloomington’s iconic Graham Hotel. When I dismantled the layout I saved the model, thankfully. As luck would have it, the shape is a perfect fit for the Brooklyn Terminal skyline. When I originally built the hotel I left the side tight against the backdrop […]

Brooklyn Terminal Feb. 16


With the PC ties in place and the rail sections fabricated, it’s time to start building the turnouts. The first step is to tin the bottom of the rails. You can see me doing this with the section clamped in the parts holder. Once that’s done, I then solder the pieces onto the PC ties. […]