Wrapped up my CF-7 project…..finally!
CF-7 Finished!
- Post author By Lmind1
- Post date
- Categories In Construction, Los Angeles Junction Railway
Wrapped up my CF-7 project…..finally!
On my business layout design blog I just posted a piece on the pros and cons of double tracking. You can read it HERE.
Following the sale to Atlas, BLMA’s outstanding chain link fence etchings have become as rare as hen’s teeth. I was concerned where we modern era industrial modelers would find this necessary staple. Fortunately, Alkem Scale Models has stepped in to fill the void. At last Sunday’s Holiday gathering Bernie Kempinski of Alkem came by and showed […]
At the corner of Corona Avenue, I had roughly a six-inch gap to fill between the street and the primary industry on that block. I didn’t want anything too over the top and something that blended into the neighboring structure. For the side with the tagging on it, I used an image from my trip to […]
Chipping away at the details on LAJ CF-7 #2619….. Cut levers from an Athearn Genesis F unit, air hose, and MU stand. The prototype only had two stacks so I shaved two of the four stacks off.