Looking “the other direction” up the canal on East Rail 2. Omni Logistics is in the background. The team track splits to the right.
East Rail 1/6/2025
- Post author By Lmind1
- Post date
- Categories In East Rail 2
- No Comments on East Rail 1/6/2025
Looking “the other direction” up the canal on East Rail 2. Omni Logistics is in the background. The team track splits to the right.
With East Rail 2 being the cover story in this month’s RMC I decided to put the layout to work so you could see it in action. Episode 10 of my ops 101 YouTube series focuses on OMNI logistics and what’s involved in working it. I’m still experimenting with the YouTube format but for now […]
A worker at East Rail’s team track takes a break to smell the roses and watch the sunset. The portable unloading platform was kitbashed using a mix of various Tichy Parts.
I learned an interesting factoid this week, Cryo-Trans reefers all carry individual names much as passenger cars of old did. Pretty cool. Here Cryo-Trans “Big Lost River” sits on The Big Hole Lead on the East Rail 2 layout. The combination of an old iPhone6 and Helicon Focus creates a sense of size and mass. […]
Preparing to shove into Weeks Gas on my East Rail 2 layout. Weeks Gas is the “problem child” of the East Rail industrial park. With one exception (the problem child), all turnouts in the park are oriented the same way. Doing so, makes switching straightforward in that every industry can be worked with push/pull moves. […]