Author: Lmind1

Ops 101, Episode 9

Last night I uploaded episode 9 of my Switching Operations 101 YouTube series. In this installment I illustrate how you can get the operational play value of three, reefer served, industries without a single turnout, spur, or structure being needed. I’ve been very appreciative of the clarification and elaboration provided by the professional rails that […]

El Tigre

This summer’s focus for The Downtown Spur is working on the structures along the 1400 block of 22nd Street (which parallels the railroad). The latest project is El Tigre Meat and Provisions as it looked around 2007. It was necessary to selectively compress the length. The main goal was to capture the hand-painted logo. Here’s […]