The awning and support poles were tricky to construct but are now in the bag as is the roof. Not clearly visible is a bank of three conduits I fabricated from spring wire just above the awning to the right of the window. All that remains is the corrugated metal treatment of the awning and […]
Author: Lmind1
Domingo Produce Mar. 31
This weekend’s focus was on the structure face below the awning. The photo editing process left an overly uniform and smooth look to the coloring. In addition there is the ever present flat surface when dealing with photo laminates. I printed out a third image of the structure face, cut out the electrical boxes and […]
Domingo Produce March 23rd
There’s still tons more to do but I got the walls up this weekend so at least you can begin to see what it will look like.
Domingo Produce March 17
This week’s focus was completing more of the 13th Avenue/22nd Street intersection, feathering in the ballast at the grade crossing, and adding the asphalt apron between the sidewalk and foundation. The foundation was painted, weathered, and photo laminates and dock bumpers added to the dock face.
Domingo Produce March 10
With urban layouts, pavement areas take as more or more time than the structures themselves. Today was spent doing the photoshop work and installation of the rest of the 13th Avenue grade crossing. I also completed the foundation for the structure. I used 3/4″ pvc wood that my Dad planed down to 9/16″ to represent […]