Pivoting Back to the Spur

1401 22nd Street, NW facing NW. 2006 photo

With East Rail 2 now finished, it’s time to pivot back to work on the Downtown Spur. The DTS layout is approaching the finish line with only three or four fairly straightforward structures to build. Currently on the workbench is the pink Streamline Moderne structure at 1401 22nd Street. The inset, curved face makes things a little tricky.

If anybody is interested in operating the layout, drop me a line and I’ll see what we can do. I live in the northern Washington, DC suburbs. The best time on my end would be Friday or Sunday afternoon.