One of the great planning fall backs is, when stuck, just copy the prototype. I’d been struggling with one aspect of composing the foreground structures. Specifically, if I put a row of foreground structures end to end on 50th street it would be difficult to see the background structures. The solution? Remove every other foreground structure and replace it with a parking lot. The lot would be framed on both sides by a building. To make things even more interesting, at least one of the lots could be a container storage yard as per the photo above.