Work this week centered on getting a flat and firm base for the model and working on the bottom lip of the structure so it sat on the base with no visible gaps. The base itself is a sheet of .093″ acrylic (the shiny black area in the photo) picked up from The Home Depot. Also added was the sidewalk apron in front.