State of the Union – East Rail

I should probably post more wide angle/overall shots of the layout.

An overall of the entire layout as it stands today. Only two structures left to build.

The left side of the layout with the just completed Tropical International structure in place.

The right side with the recently finished cryo reefer spotted at the logistics warehouse.

Leave a Reply

Your email address will not be published. Required fields are marked *