2024 gets off to a productive start with the completion of East Rail’s SALCO structure, the largest industry on the left wing of the layout. Since the basic framework of the building is pretty simple, I opted to scratch build it out of styrene. Windows, doors, and vents are photographs inset into the walls. All other surfaces were colored with paint.
Looks great, Lance! I’m really enjoying seeing East Rail 2 take shape.
Thanks Brad!
Really looks great. Love the subtle paint shading on the walls. Just right. Neat to see it finished after seeing the blank one in progress.
Thanks Ben