Monthly archives: March, 2019

Domingo Produce March 17

This week’s focus was completing more of the 13th Avenue/22nd Street intersection, feathering in the ballast at the grade crossing, and adding the asphalt apron between the sidewalk and foundation. The foundation was painted, weathered, and photo laminates and dock bumpers added to the dock face. A low angle shot of the dock face showing…


Domingo Produce March 10

With urban layouts, pavement areas take as more or more time than the structures themselves. Today was spent doing the photoshop work and installation of the rest of the 13th Avenue grade crossing. I also completed the foundation for the structure. I used 3/4″ pvc wood that my Dad planed down to 9/16″ to represent…


Domingo Produce

I’m still in the mood to do some more work on the Downtown Spur so the next project will be the eye catching Domingo Produce structure on 13th Ave. Mocking things up with a sheet of paper I’ve found I’ll be able to maintain the prototype dimensions on the south face. The north wall will…